Zholymbet Gold Deposit

Zholymbet Gold Deposit

2,600 m

total cable length

2021

year of realization

Object description:

The Zholymbet deposit is located 65 km northeast of Astana, the capital of Kazakhstan, and is owned by AK Altynalmas.
Discovered in 1932, the deposit is operated by a combination of open-pit and underground mining, with the annual output of 500,000 tons of ore.

Situation:

A reconstruction project of the fuel and lubricants depot and truck rack was initiated.

Task:

To protect the fuel and lubricants depot and truck rack pipelines from freezing and to maintain the required temperatures.

Solution:

We supplied electric heating systems based on BTC self-regulating heating cable as part of the reconstruction project of the fuel and lubricants depot and truck rack pipelines.

Zholymbet Gold Deposit

Zholymbet Gold Deposit, Kazakhstan

2,600 m

total cable length

2021

year of realization

Object description:

The Zholymbet deposit is located 65 km northeast of Astana, the capital of Kazakhstan, and is owned by AK Altynalmas. Discovered in 1932, the deposit is operated by a combination of open-pit and underground mining, with the annual output of  500,000 tons of ore.

Situation:

A reconstruction project of the fuel and lubricants depot and truck rack was initiated.

Task:

To protect the fuel and lubricants depot and truck rack pipelines from freezing and to maintain the required temperatures.

Solution:

We supplied electric heating systems based on BTC self-regulating heating cable as part of the reconstruction project of the fuel and lubricants depot and truck rack pipelines.