Wellhead Platform Zhdanov-A

Wellhead Platform Zhdanov-A

3,400 m

total cable length

200 kW

total system output

Object description:

The Dzhygalybeg (Zhdanov) and the Dzheitune (Lam) oil and gas fields together form the Cheleken Contract Area that covers approximately 950 square kilometers, located in water between 8 and 42 meters deep in the eastern section of the Caspian Sea, offshore Turkmenistan.
The initial exploration and prospecting of the Zhdanov structure began in 1965. The first well with commercial oil and gas was drilled in 1966.

Situation:

Dragon Oil, аn operator of Cheleken Contract Area, has completed a number of successful workovers in the Zhdanov Field and installed its first new platform,
Zhdanov-A.

Task:

To provide uninterrupted operations of pipelines systems at Zhdanov-A platform as well as to create safe environment for personnel.

Solution:

Our company provided electric heating systems.

Wellhead Platform Zhdanov-A

Wellhead Platform Zhdanov-A

3,400 m

total cable length

200 kW

total system output

Object description:

The Dzhygalybeg (Zhdanov) and the Dzheitune (Lam) oil and gas fields together form the Cheleken Contract Area that covers approximately 950 square kilometers, located in water between 8 and 42 meters deep in the eastern section of the Caspian Sea, offshore Turkmenistan.
The initial exploration and prospecting of the Zhdanov structure began in 1965. The first well with commercial oil and gas was drilled in 1966.

Situation:

Dragon Oil, аn operator of Cheleken Contract Area, has completed a number of successful workovers in the Zhdanov Field and installed its first new platform,
Zhdanov-A.

Task:

To provide uninterrupted operations of pipelines systems at Zhdanov-A platform as well as to create safe environment for personnel.

Solution:

Our company provided electric heating systems.