Object description:

Bharat Petroleum Corporation Limited (BPCL) is an Indian government-owned oil and gas explorer and producer. The company is India’s second largest downstream oil company. BPCL’s Refinery at Mahul Chembur, established in 1955 and located in the eastern Mumbai suburbs,  currently has the capacity of process 12 million tonnes of crude oil per annum,  producing liquefied petroleum gas, mineral turpentine oil, aviation turbine fuel, kerosene, motor spirit, diesel, furnace oil, and bitumen.

Situation:

Electric heating systems were required for gas turbine fuel gas lines, chemical injection lines of the water desalination plant, the water building area, and chlorination plant lines.

Task:

To enable smooth operations of state-of-the-art power and water plants in Duqm.

Solution:

Our company was responsible for the design and supply of electric heating systems, Ex-proof junction boxes JB, control panels and accessories.

The project design took 120 hours. Electric heating systems based on self-regulating cables HTP and series-resistance cables SNF were installed.

Integrated Electricity and Water Plant in Duqm

Integrated
Electricity
and Water Plant
in Duqm, Oman

1,402 m

total cable length

120 hours

total project design

Object description:

Bharat Petroleum Corporation Limited (BPCL) is an Indian government-owned oil and gas explorer and producer. The company is India’s second largest downstream oil company. BPCL’s Refinery at Mahul Chembur, established in 1955 and located in the eastern Mumbai suburbs,  currently has the capacity of to process 12 million tonnes of crude oil per annum, producing liquefied petroleum gas, mineral turpentine oil, aviation turbine fuel, kerosene, motor spirit, diesel, furnace oil, and bitumen.

Situation:

Electric heating systems were required for gas turbine fuel gas lines, chemical injection lines of the water desalination plant, the water building area, and chlorination plant lines.

Task:

To enable smooth operations of state-of-the-art power and water plants in Duqm.

Solution:

Our company was responsible for the design and supply of electric heating systems, Ex-proof junction boxes JB, control panels, and accessories. The project design took 120 hours. Electric heating systems based on self-regulating cables HTP and series-resistance cables SNF were installed.